CLIENT:
South 32
DURATION:
37 Weeks
STATUS:
Completed
VALUE:
$37,500,000

South 32

South 32 Fit Out

Byte was engaged as the preferred contractor to construct South 32’s new offices at 108 St Georges Terrace, an iconic contemporary tower in Perth’s CBD, showcase a strong design statement for a business focused on mining non-ferrous metals.

We delivered the project one month ahead of schedule, with a contiguous workspace over nine floors and a business lounge in the Palace Hotel.

We overcame design challenges to accommodate the fit-out within the existing building, including compatibility with base build network interfaces and coordination with separately contracted MCR works.

Stage 2 involved working within the heritage-listed Palace Hotel, requiring sensitivity to ensure the design and construction complemented the existing heritage areas.

South 32 Fit Out
South 32 Fit Out
South 32 Fit Out

More Projects