A challenging project all-round, which made it even more rewarding once completed.
The project involved dividing a massive 6000m2 unit, formerly Kmart, into three main smaller tenancies during a pandemic, a resource boom and inside a ‘LIVE’ shopping centre!
Not one, but FIVE crane lifts were required overnight to complete new Mechanic Electrical and Hydraulic services upgrade to the entire 6000m2 as well as other extensive night works and major structural works throughout the life of the project.
In Summary, this was a full de-fit to base build and repeat!
It could not have been the success it was without the superb efforts of all involved.
A huge thank you from Team Byte to everyone.